With construction and activity everywhere, thin, water-soaked cloths are placed over newly poured concrete. The technique is an effort to reduce cracking as the concrete cures. These workers are constructing new office buildings for the Taji Location Command on Sept. 25, 2008.
Date Taken: | 09.25.2008 |
Date Posted: | 09.25.2008 15:55 |
Photo ID: | 118075 |
VIRIN: | 080925-A-5208H-002 |
Resolution: | 3872x2592 |
Size: | 5.62 MB |
Location: | TAJI, IQ |
Web Views: | 65 |
Downloads: | 14 |
This work, Iraqi Army Location Command Building for the Future [Image 2 of 2], by SSG Gary Hawkins, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.