Marines with Combat Cargo, 11th Marine Expeditionary Unit, check load manifests in the hangar bay of the USS Makin Island during Amphibious Squadron Marine Expeditionary Unit Integration Training (PMINT), off the coast of San Diego, April 11, 2014. PMINT is a two-week long predeployment training event focusing on the combined capabilities of the Marine Expeditionary Unit and Amphibious Ready Group (ARG), conducting amphibious operations, crisis response and limited contingency operations. (U.S. Marine Corps photo by Gunnery Sgt. Rome M. Lazarus/Released)
Date Taken: | 04.11.2014 |
Date Posted: | 04.12.2014 02:20 |
Photo ID: | 1241677 |
VIRIN: | 140411-M-CB493-009 |
Resolution: | 5472x3648 |
Size: | 7.79 MB |
Location: | USS MAKIN ISLAND, AT SEA |
Web Views: | 37 |
Downloads: | 35 |
This work, Amphibious Squadron Marine Expeditionary Unit Integration (PMINT) [Image 34 of 34], by GySgt Rome Lazarus, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.