A section of the generator from unit one. Workers are rewinding the generators with enhanced coils. The new coils will allow for a greater ratio of copper to insulation to increase electric output.
Date Taken: | 05.22.2014 |
Date Posted: | 05.29.2014 12:14 |
Photo ID: | 1369735 |
VIRIN: | 140522-A-PO406-003 |
Resolution: | 3872x2592 |
Size: | 3.07 MB |
Location: | TULSA, OKLAHOMA, US |
Web Views: | 26 |
Downloads: | 4 |
This work, Webbers Falls rehabilitation nearly two-thirds complete [Image 2 of 2], by Brannen Parrish, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.