A surveyer measures a point on MSR Tampa in preparation for further paving of the highway. Road workers pave the road for 8 to 10 hours daily in the Iraqi heat.
Date Taken: | 09.06.2004 |
Date Posted: | 09.23.2004 17:48 |
Photo ID: | 1378 |
Resolution: | 1512x1071 |
Size: | 205.27 KB |
Location: | TALLIL, IQ |
Web Views: | 69 |
Downloads: | 14 |
This work, Engineers pave road to safe transport [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.