Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    145th Maintenance Group works together to complete structural inspection [Image 6 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    145th Maintenance Group works together to complete structural inspection

    CHARLOTTE, NORTH CAROLINA, UNITED STATES

    09.16.2014

    Photo by Staff Sgt. Julianne Showalter 

    145th Airlift Wing, North Carolina Air National Guard

    U.S. Air Force members the 145th Maintenance Group work together to complete a C-130 Hercules aircraft 540-day structural inspection where preventative maintenance is done and components are checked for functionality. The inspection takes a total of 45 days to complete, and utilizes the expertise of each maintenance section from sheet metal to avionics systems at the North Carolina Air National Guard Base, Charlotte Douglas International Airport, Sept. 16, 2014. (U.S. Air National Guard photo by Staff Sgt. Julianne M. Showalter, 145th Public Affairs/Released)

    IMAGE INFO

    Date Taken: 09.16.2014
    Date Posted: 09.16.2014 16:26
    Photo ID: 1552634
    VIRIN: 140916-Z-RZ465-130
    Resolution: 4288x2848
    Size: 7.75 MB
    Location: CHARLOTTE, NORTH CAROLINA, US

    Web Views: 29
    Downloads: 3

    PUBLIC DOMAIN