Iraqi assistant director general of the transmission office of the ministry of electricity, Adil Habouby, talks to project engineers during a visit to a newly constructed electrical sub-station in Oubaidy, eastern Baghdad, Iraq, on April 26.
Date Taken: | 04.26.2009 |
Date Posted: | 05.02.2009 19:50 |
Photo ID: | 169323 |
VIRIN: | 090426-A-4676S-101 |
Resolution: | 4256x2832 |
Size: | 3.7 MB |
Location: | JOINT SECURITY STATION LOYALTY, IQ |
Web Views: | 48 |
Downloads: | 4 |
This work, Electrical substation in Oubaidy [Image 14 of 14], by James Selesnick, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.