Completed project area showing newly installed wood posts and rails along with new lawn area. Newly installed Kiosk (side view) is third in row.
Date Taken: | 10.25.2014 |
Date Posted: | 12.30.2014 11:58 |
Photo ID: | 1710804 |
VIRIN: | 141025-A-ME637-001 |
Resolution: | 2832x2128 |
Size: | 5.41 MB |
Location: | CONCORD, MASSACHUSETTS, US |
Web Views: | 9 |
Downloads: | 1 |
This work, Boy Scout completes river trail parking lot upgrades [Image 2 of 2], by Jess Levenson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.