John Eschenberg, Uranium Processing Facility federal project director, concludes the Site Readiness Celebration March 13, 2015, at the New Hope Center located in the Y-12 National Security Complex in Oak Ridge, Tenn. (USACE photo by Leon Roberts)
Date Taken: | 03.13.2015 |
Date Posted: | 03.17.2015 18:13 |
Photo ID: | 1818851 |
VIRIN: | 150313-A-EO110-005 |
Resolution: | 4288x2848 |
Size: | 6.56 MB |
Location: | OAK RIDGE, TENNESSEE, US |
Web Views: | 19 |
Downloads: | 1 |
This work, Corps completes its Oak Ridge site preparation work [Image 6 of 6], by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.