Soldiers from the 2120th Engineer Company, headquartered in Broken Arrow, Oklahoma, break up rocks and prepare to level the ground during a construction project at Camp Gruber on June 11. The engineers will be working on numerous projects at Camp Gruber throughout the month of June. (Photo by Sgt. Jared Sollars)
Date Taken: | 06.11.2015 |
Date Posted: | 06.22.2015 11:59 |
Photo ID: | 2004710 |
VIRIN: | 150611-Z-SS272-0024 |
Resolution: | 1800x1200 |
Size: | 2.19 MB |
Location: | OKLAHOMA, US |
Web Views: | 15 |
Downloads: | 2 |
This work, Army Engineers improve Camp Gruber [Image 8 of 8], by SGT Jared Sollars, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.