Main entrance sign with trucks pouring concrete in the background, during construction of the Lewis North Athletic Complex at Joint Base Lewis McChord. The complex will include four synthetic fieldturf softball fields, one synthetic fieldturf multipurpose field, a raised plaza paved with porous concrete, two basketball courts with lighting, two restroom buildings, and one concession building.
Date Taken: | 07.01.2015 |
Date Posted: | 07.02.2015 14:44 |
Photo ID: | 2042502 |
VIRIN: | 150701-A-PU960-001 |
Resolution: | 4200x3000 |
Size: | 5.05 MB |
Location: | JOINT BASE LEWIS-MCCHORD, WASHINGTON, US |
Web Views: | 199 |
Downloads: | 1 |
This work, Lewis North Athletic Complex Construction, Joint Base Lewis-McChord [Image 4 of 4], by Sidney Lee, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.