Divers assigned to Underwater Construction Team (UCT) 1, use the BR-67 hydraulic tool while conducting Rapid Penetration Testing (RPT). The purpose for the test is to check geological stability of soil prior to driving piles used to support the Elevated Causeway System (ELCAS) a modular pier system that is used to move vehicles and equipment efficiently from ship to shore.
Date Taken: | 07.14.2015 |
Date Posted: | 07.28.2015 09:11 |
Photo ID: | 2091153 |
VIRIN: | 150714-N-IM663-004 |
Resolution: | 1523x1207 |
Size: | 275.8 KB |
Location: | VIRGINIA BEACH, VIRGINIA, US |
Web Views: | 69 |
Downloads: | 12 |
This work, Seabees work above and below the waves in support of ELCAS [Image 3 of 3], by PO2 Justin Mohr, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.