Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    C-5 System Integration Lab updates CMC and CWR [Image 3 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    C-5 System Integration Lab updates CMC and CWR

    WARNER ROBINS, GEORGIA, UNITED STATES

    08.11.2015

    Photo by Tommie Horton 

    78th Air Base Wing

    Tony Kirksey, 402nd Software Maintenance Squadron electronic engineer, monitors the health of the aircraft during a simulated mission in the Warner Robins Air Logistics Complex C-5 System Integration Lab. The 402nd Software Maintenance Group has been tasked by the C-5 System Program Office with updating the SIL with installation of a new Core Mission Computer and Color Weather Radar. The tasking is in support of an effort by Lockheed Martin under the direction of the SPO to develop upgrades to the CMC and CWR systems as part of a long-term program to extend the life of the Air Force C-5 fleet beyond 2040. (U.S. Air Force photo by Tommie Horton)

    IMAGE INFO

    Date Taken: 08.11.2015
    Date Posted: 08.18.2015 13:03
    Photo ID: 2122063
    VIRIN: 150811-F-UI543-044
    Resolution: 4224x2712
    Size: 11.89 MB
    Location: WARNER ROBINS, GEORGIA, US

    Web Views: 208
    Downloads: 18

    PUBLIC DOMAIN