Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    F-35 Lightning II begins DT-II aboard USS Dwight D. Eisenhower [Image 26 of 39]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    F-35 Lightning II begins DT-II aboard USS Dwight D. Eisenhower

    USS DWIGHT D. EISENHOWER, ATLANTIC OCEAN

    10.02.2015

    Courtesy Photo

    F-35 Lightning II Pax River ITF   

    ATLANTIC OCEAN (Oct. 2, 2015) During the second developmental test (DT-II) phase of the F-35C Lightning II aboard USS Dwight D. Eisenhower (CVN 69), two F-35C test aircraft are performing a variety of operational maneuvers, simulating maintenance operations and conducting general maintenance and fit tests for the aircraft and support equipment. A test team from the Pax River Integrated Test Force (ITF) is conducting a thorough assessment of the F-35C’s performance before advising the Navy on any adjustments necessary to ensure that the next-generation fighter is ready to meet its scheduled initial operating capability (IOC) in 2018. (U.S. Navy Photo Courtesy Lockheed Martin Photo by Andrew McMurtrie/Released)

    IMAGE INFO

    Date Taken: 10.02.2015
    Date Posted: 10.05.2015 08:41
    Photo ID: 2212417
    VIRIN: 151002-O-ZZ999-710
    Resolution: 5107x3421
    Size: 2.11 MB
    Location: USS DWIGHT D. EISENHOWER, ATLANTIC OCEAN

    Web Views: 134
    Downloads: 87

    PUBLIC DOMAIN