Airmen from the 577th Expeditionary Prime Base Engineer Emergency Force Squadron from Al Udeid Air Base, Qatar, remove rubber from the runway Oct. 22, 2015, at Bagram Air Field, Afghanistan. Foam and biodegradable solvents are used to strip the rubber left behind by the aircraft that land or take off from Bagram in support of Operation Freedom’s Sentinel and NATO’s Resolute Support mission. (U.S. Air Force photo by Tech. Sgt. Nicholas Rau/Released)
Date Taken: | 10.22.2015 |
Date Posted: | 10.26.2015 09:20 |
Photo ID: | 2248853 |
VIRIN: | 151022-F-EB935-012 |
Resolution: | 3679x2020 |
Size: | 3.91 MB |
Location: | BAGRAM AIR FIELD, AF |
Web Views: | 41 |
Downloads: | 8 |
This work, Civil Engineer teams come together to maintain runway, ensure combat airpower [Image 9 of 9], by Nicholas Rau, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.