Tony Martinez, crane mechanic, removes a panel from an F-15A Eagle on the flight line at Davis-Monthan Air Force Base, Ariz., Nov. 17, 2015. A team of contractors took five days to completely disassemble the F-15A Eagle and load it onto two flatbed trucks to be shipped to Joint Base Lewis-McChord, Wash., for display. The entire project is estimated to take approximately eight months from the planning stage to finish. (U.S. Air Force photo by Airman Basic Nathan H. Barbour/Released)
Date Taken: | 11.17.2015 |
Date Posted: | 11.23.2015 17:43 |
Photo ID: | 2303107 |
VIRIN: | 151117-F-ID393-063 |
Resolution: | 2465x1761 |
Size: | 621.04 KB |
Location: | TUCSON, ARIZONA, US |
Web Views: | 24 |
Downloads: | 10 |
This work, F-15A disassembled at D-M [Image 7 of 7], by SrA Nathan Barbour, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.