Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Post-installation test fire [Image 1 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Post-installation test fire

    BAHRAIN

    02.01.2016

    Courtesy Photo

    Commander Task Force 56

    160201-N-BJ294-010 ARABIAN GULF (Feb. 1, 2016) Gunner's Mate 2nd Class Dwayne Joseph assigned to the coastal patrol ship USS Tempest (PC2) opens the doors of a Griffin Missile System for a post-installation test fire for certification with Patrol Coastal Sqaudron (PCRON) 1. PCRON 1 is deployed to the U.S. 5th Fleet area of operations supporting maritime security operations and theater security cooperation efforts. (U.S. Navy Combat Camera photo by Mass Communication Specialist 2nd Class Wyatt Huggett/Released)

    IMAGE INFO

    Date Taken: 02.01.2016
    Date Posted: 02.07.2016 04:42
    Photo ID: 2388457
    VIRIN: 160201-N-BJ294-010
    Resolution: 3204x2253
    Size: 539.42 KB
    Location: BH

    Web Views: 14
    Downloads: 3

    PUBLIC DOMAIN