Airman 1st Class Patrick Chuba, 455th Expeditionary Civil Engineer Squadron pavements and equipment technician, screws down a roof frame on top of a transient lodging room at the 455th Expeditionary Operations Support Squadron Detachment 1 compound on Jalalabad Airfield, Afghanistan, Feb. 16, 2016. A team of 455th ECES members forward deployed from Bagram to begin construction shortly after the 455th EOSS Detachment 1 was established as Senior Airfield Authority at Jalalabad Airfield, Dec. 12, 2015. SAA responsibilities include managing airfield operations to control aircraft movement, airfield security, and the maintenance and construction of airfield infrastructure and facilities. (U.S. Air Force photo/Tech. Sgt. Robert Cloys)
Date Taken: | 02.17.2016 |
Date Posted: | 02.19.2016 04:52 |
Photo ID: | 2410070 |
VIRIN: | 160217-F-CX842-354 |
Resolution: | 5038x3359 |
Size: | 6.76 MB |
Location: | JALALABAD AIRFIELD, AF |
Web Views: | 37 |
Downloads: | 6 |
This work, Bagram CE team builds new War Hawk compound at Jalalabad Airfield [Image 26 of 26], by TSgt Robert Cloys, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.