Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Maintenance inspection keeps aircraft flying [Image 6 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Maintenance inspection keeps aircraft flying

    RAMSTEIN AIR BASE, RHEINLAND-PFALZ, GERMANY

    01.07.2016

    Photo by Staff Sgt. Timothy Moore 

    86th Airlift Wing

    Staff Sgt. Jonathan Deguzman, left, and Staff Sgt. Joshua Stites, both 86th Maintenance Squadron aerospace propulsion journeymen, inspect an engine on a C-130J Super Hercules during a C-2 isochronal (ISO) inspection Jan. 7, 2016, at Ramstein Air Base, Germany. During a C-2 ISO inspection, the aircraft is thoroughly inspected so maintenance personnel can perform both preventive and required maintenance to prolong the lifespan of the aircraft. The inspection can last approximately two weeks. (U.S. Air Force photo/Staff Sgt. Timothy Moore)

    IMAGE INFO

    Date Taken: 01.07.2016
    Date Posted: 02.24.2016 02:32
    Photo ID: 2418687
    VIRIN: 160107-F-EN010-172
    Resolution: 5670x3508
    Size: 2.54 MB
    Location: RAMSTEIN AIR BASE, RHEINLAND-PFALZ, DE

    Web Views: 36
    Downloads: 4

    PUBLIC DOMAIN