Donald Topper, 375th Civil Engineer Squadron Exterior Work Leader, installs a temporary grounding rod to ensure proper grounding before working on the power lines during a scheduled power outage April 9, 2016 at Scott Air Force Base, Ill. The purpose of the scheduled power outage was to repair critical high voltage electrical components at sub-stations on base. (U.S. Air Force Photo/Senior Airman Joshua Eikren)
Date Taken: | 04.09.2016 |
Date Posted: | 04.15.2016 14:54 |
Photo ID: | 2527068 |
VIRIN: | 160409-F-MJ664-008 |
Resolution: | 3683x5516 |
Size: | 6.2 MB |
Location: | SCOTT AIR FORCE BASE, ILLINOIS, US |
Web Views: | 49 |
Downloads: | 4 |
This work, Electricians Upgrade Power Sub-stations [Image 8 of 8], by SrA Joshua Eikren, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.