Operator Trainee Les Rice explains generator capabilities inside Thurmond Dam's power house July 6. The dam houses seven generator units rated at 54 million watts each. One unit can power roughly 54,000 homes clustered along the Savannah River Basin.
Date Taken: | 07.06.2016 |
Date Posted: | 08.03.2016 11:18 |
Photo ID: | 2764664 |
VIRIN: | 160706-A-XV621-009 |
Resolution: | 1088x722 |
Size: | 193.76 KB |
Location: | AUGUSTA, GEORGIA, US |
Web Views: | 5 |
Downloads: | 2 |
This work, Corps dams demand best of operator trainees [Image 3 of 3], by TSgt Chelsea Smith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.