Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Bridge to the Future Under Construction in Central Iraq [Image 3 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Bridge to the Future Under Construction in Central Iraq

    Soldiers with the 250th Engineer Company (Multi-Role Bridge), 367th Engineer Battalion, 36th Engineer Brigade, onboard an Army watercraft, prepare to move a pontoon down the Tigris River June 1 during the construction of a float bridge near Salman Pak, Iraq. The 250th MRBC is a specially trained engineer unit from the Connecticut Army National Guard conducting water crossing and float bridge operations in support of Operation Iraqi Freedom.

    IMAGE INFO

    Date Taken: 06.01.2010
    Date Posted: 06.05.2010 09:01
    Photo ID: 286645
    VIRIN: 100601-A-7794S-054
    Resolution: 1542x1024
    Size: 642.59 KB
    Location: SALMAN PAK, IQ

    Web Views: 336
    Downloads: 29

    PUBLIC DOMAIN