The Corps is constructing a new navigation lock at Kentucky Dam to reduce the significant bottleneck that the 600-foot-long current lock causes on this important waterway. Because of high Tennessee River traffic levels and the current lock’s size, the average delay times for commercial tows going through Kentucky Lock average from seven to over nine hours – near the highest in the country.
Date Taken: | 08.15.2013 |
Date Posted: | 10.18.2016 18:29 |
Photo ID: | 2929870 |
VIRIN: | 161013-A-BO243-001 |
Resolution: | 2100x1402 |
Size: | 411.77 KB |
Location: | GRAND RIVERS, KENTUCKY, US |
Web Views: | 11 |
Downloads: | 2 |
This work, Lt. Gov visits Kentucky Lock Addition Project [Image 8 of 8], by Mark Rankin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.