Soldiers from the 239th Multi-Role Bridge Company, from Granite City, Ill., prepare engineering boats that will be used to move sections of the Qayyarah bridge in Northern Iraq, during a 24-hour operation to remove the bridge, June 20.
Date Taken: | 06.20.2010 |
Date Posted: | 06.26.2010 06:46 |
Photo ID: | 294095 |
VIRIN: | 100620-A-8151G-007 |
Resolution: | 399x600 |
Size: | 196 KB |
Location: | CONTINGENCY OPERATING SITE MAREZ, IQ |
Web Views: | 200 |
Downloads: | 27 |
This work, Removing a Bridge Across the Tigris River [Image 2 of 2], by Dustin Gautney, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.