Sticky notes represent every step to overhauling a TF-34 engine used in A-10s, Jan. 23, 2017, at Moody Air Force Base, Ga. Representatives from Air Combat Command traveled to Moody Air Force Base to participate in a Continuous Process Improvement event with the goal of decreasing the scheduled 28 days it takes to disassemble, repair and reassemble the TF-34 engine. (U.S. Air Force photo by Airman 1st Class Daniel Snider)
Date Taken: | 01.23.2017 |
Date Posted: | 01.31.2017 12:14 |
Photo ID: | 3133187 |
VIRIN: | 170123-F-EJ242-1003 |
Resolution: | 3000x2000 |
Size: | 3.08 MB |
Location: | MOODY AIR FORCE BASE, GA., GEORGIA, US |
Web Views: | 25 |
Downloads: | 7 |
This work, CMS aims to raise the bar [Image 4 of 4], by SSgt Daniel Snider, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.