U.S. Marines with 7th Engineer Support Battalion, 1st Marine Logistics Group, clean up the aftermath of the demolition of one of the dams at Cleveland National Forest in Silverado, Calif., while placing C4 on the next part of the dam on March 22, 2017. There will be two more iterations of this training over the next two years, demolishing 10 dams every year until all 30 dams have been removed. (U.S. Marine Corps photo by Lance Cpl. Adam Dublinske)
Date Taken: | 03.27.2017 |
Date Posted: | 03.27.2017 20:05 |
Photo ID: | 3263600 |
VIRIN: | 170327-M-QP663-323 |
Resolution: | 5760x3840 |
Size: | 10.56 MB |
Location: | SILVERADO, CALIFORNIA, US |
Web Views: | 78 |
Downloads: | 8 |
This work, Dam Demolition Project [Image 5 of 5], by Sgt Adam Dublinske, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.