Pfc. Michael Waldon, a carpentry/masonry engineer with the 808th Engineer Company out of Houston, Texas, lays cinderblocks at the Ladyville Clinic construction site in Belize as part of Beyond the Horizon on April 12, 2017. BTH 2017 is a U.S.-Belize partnership exercise designed to improve health and educational facilities as well as provide free health care and healthcare education in the three districts of Cayo, Stann Creek and Belize.
Date Taken: | 04.12.2017 |
Date Posted: | 04.17.2017 21:41 |
Photo ID: | 3319061 |
VIRIN: | 170412-Z-QP360-003 |
Resolution: | 2682x1916 |
Size: | 1.2 MB |
Location: | LADYVILLE, BZ |
Web Views: | 25 |
Downloads: | 10 |
This work, Block by block [Image 6 of 6], by SGT Scott Wolfe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.