Tech. Sgt. Kevin Wannemacher, 455th Expeditionary Prime BEEF Squadron water and fuels system craftsman, seals sheets of drywall in a newly constructed fire station March 24, 2017 at Bagram Airfield, Afghanistan. The 577th Expeditionary Prime BEEF Squadron was established in September 2009 to carry out installation engineer capabilities. (U.S. Air Force photo by Staff Sgt. Katherine Spessa)
Date Taken: | 03.24.2017 |
Date Posted: | 04.20.2017 09:04 |
Photo ID: | 3323566 |
VIRIN: | 170324-F-TY749-173 |
Resolution: | 7153x4024 |
Size: | 18.83 MB |
Location: | BAGRAM AIRFIELD, PARWAN PROVINCE, AF |
Web Views: | 19 |
Downloads: | 5 |
This work, Prime BEEF builds up Bagram [Image 5 of 5], by Katherine Spessa, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.