Residents of Trakh Nawa, Afghanistan, watch as the final touches are placed on a bridge construction project, Oct. 28. Approximately 40 Marines with CLB-3’s Engineer Company constructed the bridge in less than two days.
Date Taken: | 10.28.2010 |
Date Posted: | 11.01.2010 06:48 |
Photo ID: | 335457 |
VIRIN: | 101028-M-9430W-006 |
Resolution: | 4584x2892 |
Size: | 749.1 KB |
Location: | TRAKH NAWA, AF |
Web Views: | 150 |
Downloads: | 19 |
This work, CLB-3 Marines construct bridge, aid Afghan community [Image 4 of 4], by Sgt Daniel Woodall, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.