Shown is a floor plan of the new locker rooms that will be renovated September – December 2017. Renovation includes cleaning and painting of walls and ceilings, tile replacement, cleaning and testing of HVAC systems and replacement of fixtures for shower heads and controls. (Courtesy graphic)
Date Taken: | 08.16.2017 |
Date Posted: | 08.23.2017 12:38 |
Photo ID: | 3698999 |
VIRIN: | 170821-F-IX728-0002 |
Resolution: | 896x518 |
Size: | 51.24 KB |
Location: | COLORADO SPRINGS, COLORADO, US |
Web Views: | 16 |
Downloads: | 3 |
This work, Schriever fitness center anticipates renovations [Image 2 of 2], by SSgt Arielle Vasquez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.