A mine clearing line charge is detonated by Engineers with the Assault Breacher Vehicle platoon, 1st Combat Engineer Battalion during operation Rawhide, March 14.
Date Taken: | 03.14.2011 |
Date Posted: | 03.28.2011 12:05 |
Photo ID: | 383164 |
VIRIN: | 110314-M-5160M-987 |
Resolution: | 3423x2282 |
Size: | 504.34 KB |
Location: | BAHRAM CHAH, AF |
Web Views: | 333 |
Downloads: | 30 |
This work, ABV Platoon Paves Way for 3rd LAR During Operation Rawhide [Image 7 of 7], by Cpl John McCall, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.