Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Runway construction prompts arresting system upgrade [Image 2 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Runway construction prompts arresting system upgrade

    SIOUX FALLS, SOUTH DAKOTA, UNITED STATES

    06.17.2015

    Photo by Staff Sgt. Duane Duimstra 

    114th Fighter Wing

    114th Civil Engineer power production Airmen and construction workers prepare the runway for the installation of the new Zodiac Arresting Systems BAK-14M retractable hook cable support system at Joe Foss Field, Sept. 15, 2017. The system maintains the fully operational status of military hook cable aircraft arresting systems installed on active runways at military-commercial joint-use airfields, while providing unobstructed runway surface for commercial aircraft traffic. U.S. Air National Guard photo Staff Sgt. Duane Duimstra)

    IMAGE INFO

    Date Taken: 06.17.2015
    Date Posted: 10.19.2017 09:18
    Photo ID: 3878040
    VIRIN: 170915-Z-SJ722-036
    Resolution: 2723x1815
    Size: 3.34 MB
    Location: SIOUX FALLS, SOUTH DAKOTA, US

    Web Views: 103
    Downloads: 8

    PUBLIC DOMAIN