114th Civil Engineer power production Airmen and construction workers prepare the runway for the installation of the new Zodiac Arresting Systems BAK-14M retractable hook cable support system at Joe Foss Field, Sept. 15, 2017. The system maintains the fully operational status of military hook cable aircraft arresting systems installed on active runways at military-commercial joint-use airfields, while providing unobstructed runway surface for commercial aircraft traffic. U.S. Air National Guard photo Staff Sgt. Duane Duimstra)
Date Taken: | 06.17.2015 |
Date Posted: | 10.19.2017 09:18 |
Photo ID: | 3878040 |
VIRIN: | 170915-Z-SJ722-036 |
Resolution: | 2723x1815 |
Size: | 3.34 MB |
Location: | SIOUX FALLS, SOUTH DAKOTA, US |
Web Views: | 101 |
Downloads: | 8 |
This work, Runway construction prompts arresting system upgrade [Image 3 of 3], by MSgt Duane Duimstra, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.