114th Aircraft Maintenance Airmen prepared aircraft during the Phase 1 of the Attack Response Exercise (ARE) Oct. 8, 2017, Joe Foss Field, S.D. The goal of the exercise was to evaluate the 114th Fighter Wing's ability to rapidly deploy personnel and materiel to a deployed location in support of a Combatant Commander. (U.S. Air National Guard photo by Staff Sgt. Duane Duimstra)
Date Taken: | 10.08.2017 |
Date Posted: | 10.20.2017 15:02 |
Photo ID: | 3882672 |
VIRIN: | 171008-Z-SJ722-031 |
Resolution: | 5520x3680 |
Size: | 8.67 MB |
Location: | SIOUX FALLS, SOUTH DAKOTA, US |
Web Views: | 19 |
Downloads: | 5 |
This work, 114th Fighter Wing conducts readiness exercise [Image 9 of 9], by MSgt Duane Duimstra, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.