U.S. Army Corps of Engineers contractor Monte Miller, electrician, prepares a cable to be connected from the generator to the panel box Nov. 10, during the installation of the 500th temporary FEMA generator at CastaƱer General Hospital in support of Hurricane Maria recovery efforts.
Date Taken: | 11.09.2017 |
Date Posted: | 11.11.2017 15:39 |
Photo ID: | 3944976 |
VIRIN: | 171110-A-RP542-001 |
Resolution: | 2005x2597 |
Size: | 979.5 KB |
Location: | PR |
Web Views: | 36 |
Downloads: | 5 |
This work, Remote Puerto Rico community hospital gets 500th FEMA generator installed by USACE [Image 5 of 5], by Edward Rivera, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.