Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    BOM Squad scours two continents to acquire critical power grid materials for Puerto Rico recovery [Image 4 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    BOM Squad scours two continents to acquire critical power grid materials for Puerto Rico recovery

    SAN JUAN, PUERTO RICO

    12.22.2017

    Photo by Gerald Rogers 

    U.S. Army Corps of Engineers, Los Angeles District

    PONCE, PUERTO RICO – Tons of critical power grid materials arrive daily for temporary housing at the Ponce warehouse, part of the critical electrical components needed to rebuild the island’s power grid. The U.S. Army Corps of Engineers’ Task Force Power Restoration team maintains 100 percent accountability of every item, from the smallest electrical component to the 5,500-pound concrete utility pole, until it arrives at the delivery site, is stored and ultimately issued to the workforce.

    IMAGE INFO

    Date Taken: 12.22.2017
    Date Posted: 01.12.2018 13:44
    Photo ID: 4075045
    VIRIN: 180111-A-HS946-148
    Resolution: 5817x3877
    Size: 3.7 MB
    Location: SAN JUAN, PR

    Web Views: 44
    Downloads: 6

    PUBLIC DOMAIN