PONCE, PUERTO RICO – Tons of critical power grid materials arrive daily for temporary housing at the Ponce warehouse, part of the critical electrical components needed to rebuild the island’s power grid. The U.S. Army Corps of Engineers’ Task Force Power Restoration team maintains 100 percent accountability of every item, from the smallest electrical component to the 5,500-pound concrete utility pole, until it arrives at the delivery site, is stored and ultimately issued to the workforce.
Date Taken: | 12.22.2017 |
Date Posted: | 01.12.2018 13:44 |
Photo ID: | 4075045 |
VIRIN: | 180111-A-HS946-148 |
Resolution: | 5817x3877 |
Size: | 3.7 MB |
Location: | SAN JUAN, PR |
Web Views: | 44 |
Downloads: | 6 |
This work, BOM Squad scours two continents to acquire critical power grid materials for Puerto Rico recovery [Image 5 of 5], by Gerald Rogers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.