Much like a car engine, generators require regular maintenance in order to function at optimal levels. The USACE temporary emergency power mission ensures federal generators in Puerto Rico are fully mission capable before they are installed at facilities across the island. If they fail any checks before installation, or require maintenance that cannot be completed on site once installed, the generators are sent to a pier in San Juan for repairs. Here, a contractor makes sure the fuel filter is working properly on a generator Jan. 14.