Contractors for the U.S. Army Corps of Engineers prepare and test generators to before delivery to critical public facilities as part of the Temporary Power mission in Puerto Rico, January 22, 2018.
Date Taken: | 01.22.2018 |
Date Posted: | 01.26.2018 07:07 |
Photo ID: | 4100954 |
VIRIN: | 180122-A-IF251-037 |
Resolution: | 6000x4000 |
Size: | 7.86 MB |
Location: | SAN JUAN, PR |
Web Views: | 24 |
Downloads: | 11 |
This work, Generator Testing [Image 3 of 3], by Andrew Kornacki, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.