(Left to Right) Dakota Mccrite and Dave Davidson, construction workers Hedgecock Electric Co., Pensacola, Fla., work on a cement form June 2, 2011. Hedgecock Electric was contracted to help Altus Air Force Base convert above-ground power lines to an under-ground supply. The under-ground power supply will benefit the base by allowing power to remain constant in times of severe weather.
Date Taken: | 06.02.2011 |
Date Posted: | 06.03.2011 17:05 |
Photo ID: | 410506 |
VIRIN: | 110602-F-GE400-094 |
Resolution: | 2100x1500 |
Size: | 557.16 KB |
Location: | ALTUS, OKLAHOMA, US |
Web Views: | 33 |
Downloads: | 4 |
This work, Altus Construction [Image 2 of 2], by A1C Christopher Toon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.