Utuado, Puerto Rico. January 27, 2018 - As construction of the Rio Abajo bridge in Utuado takes place, this temporary bridge is build for assistance during the recovery of the Rio Abajo. The bridge collapsed when debris brought by Hurricane María's heavy rain clogged the structure.
Date Taken: | 01.27.2018 |
Date Posted: | 01.30.2018 14:16 |
Photo ID: | 4105253 |
VIRIN: | 180127-D-EH690-376 |
Resolution: | 6000x4000 |
Size: | 5.3 MB |
Location: | UTUADO, PR |
Web Views: | 48 |
Downloads: | 13 |
This work, Temporary Bridge in Utuado [Image 8 of 8], by Eliezer Hernandez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.