An Improved Ribbon Bridge, a modular floating bridge that automatically unfolds when deployed in water, is employed by members of the 502nd Multi-Role Bridge Company, 19th Engineer Battalion, during its Bridge Erection Boat School in West Point, Ky., from May 31 to June 2. The bride erection boat school trained new boat operators on the effective utilization of the Mark II Bridge Erection Boat and IRB during bridging operations as well as proper operator maintenance procedures.
Date Taken: | 06.02.2011 |
Date Posted: | 06.06.2011 15:38 |
Photo ID: | 411725 |
VIRIN: | 110602-A-9177B-638 |
Resolution: | 3143x2429 |
Size: | 953.9 KB |
Location: | KENTUCKY, US |
Web Views: | 198 |
Downloads: | 2 |
This work, 502nd MRBC conducts Bridge Erection Boat school [Image 4 of 4], by SFC Michael Behlin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.