Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Engineers build new dining facility for FOB Kunduz [Image 3 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Engineers build new dining facility for FOB Kunduz

    FOWARD OPERATING BASE KUNDUZ, AFGHANISTAN

    07.02.2011

    Photo by Sgt. 1st Class Glenn Sierra 

    18th Engineer Brigade

    A dozer from the 623rd Engineer Company spreads out rocks at Forward Operating Base Kunduz for grader and roller in preparation of the ground for a new chow hall concrete pad. The area was previously littered with abandoned Soviet era wreckage. (Photo by: Sgt. 1st Class Sierra, Task Force Roughneck)

    IMAGE INFO

    Date Taken: 07.02.2011
    Date Posted: 07.13.2011 03:54
    Photo ID: 427065
    VIRIN: 110702-A-AD848-019
    Resolution: 3264x2448
    Size: 1.46 MB
    Location: FOWARD OPERATING BASE KUNDUZ, AF

    Web Views: 117
    Downloads: 1

    PUBLIC DOMAIN