Members of the 76th Engineer Company, 19th Engineer Battalion, completed this bridge crossing a portion of Camp Carlson Lake on July 1. The bridge replaced an older bridge which was in disrepair and was considered unsafe.
Date Taken: | 06.29.2011 |
Date Posted: | 07.15.2011 09:49 |
Photo ID: | 427999 |
VIRIN: | 110629-A-9177B-020 |
Resolution: | 3686x2848 |
Size: | 1.96 MB |
Location: | FORT KNOX, KENTUCKY, US |
Web Views: | 27 |
Downloads: | 0 |
This work, 19th Engineers rebuild bridge for Camp Carlson Lake [Image 5 of 5], by SFC Michael Behlin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.