U.S. Navy Seabees assigned to Underwater Construction Team 2, Construction Diving Detachment Bravo (CDDB) weld small boat fendering systems to the pile supported pier in Dili, Timor-Leste on March 23, 2018. CDDB is leading an effort with Naval Mobile Construction Battalion 4 and Timor-Leste National Police’s Maritime Police Unit to construct a steel pile pier to increase small boat berthing in support of maritime security operations. CDDB is currently deployed to provide construction, inspection, maintenance, and repair of underwater and waterfront facilities in support of the U.S. Pacific Fleet. (U.S. Navy photo by Lt. Michael Roster)
Date Taken: | 03.23.2018 |
Date Posted: | 04.20.2018 17:53 |
Photo ID: | 4319367 |
VIRIN: | 180323-N-DZ919-005 |
Resolution: | 1024x768 |
Size: | 113.95 KB |
Location: | DILI, TL |
Web Views: | 93 |
Downloads: | 10 |
This work, UCT 2 Constructs Pier for Timor Leste Maritime Police [Image 5 of 5], by PO2 Ryan Filo, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.