Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Air traffic control tower construction project [Image 4 of 6]

    Air traffic control tower construction project

    MCCONNELL AIR FORCE BASE, KANSAS, UNITED STATES

    04.16.2018

    Photo by Airman 1st Class Alan Ricker 

    22nd Air Refueling Wing

    Civilian contractors lift an air traffic control tower piece by using a crane April 16, 2018, at McConnell Air Force Base, Kansas. The crane lifted a 48,000 pounds of steel to the top of the tower to complete the cab. (U.S. Air Force photo by Airman 1st Class Alan Ricker)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.16.2018
    Date Posted: 04.23.2018 11:37
    Photo ID: 4324752
    VIRIN: 180416-F-JA727-0227
    Resolution: 4912x7360
    Size: 18.12 MB
    Location: MCCONNELL AIR FORCE BASE, KANSAS, US

    Web Views: 30
    Downloads: 4

    PUBLIC DOMAIN