Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USS Freedom [Image 2 of 26]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    USS Freedom

    SAN DIEGO, CALIFORNIA, UNITED STATES

    07.20.2011

    Photo by Petty Officer 1st Class Elena Pence 

    U.S. Navy           

    The littoral combat ship USS Freedom (LCS 1) continues a scheduled four-month maintenance period in a dry dock at Naval Base San Diego. Freedom is the first of two littoral combat ships designed to operate in shallow water environments to counter threats in coastal regions. The ship is still under contractor trials and after completing this maintenance period Freedom will go through her final contractor trials and begin fleet operations.

    IMAGE INFO

    Date Taken: 07.20.2011
    Date Posted: 07.27.2011 23:36
    Photo ID: 435291
    VIRIN: 110720-N-DI719-012
    Resolution: 2100x1500
    Size: 2.01 MB
    Location: SAN DIEGO, CALIFORNIA, US

    Web Views: 130
    Downloads: 10

    PUBLIC DOMAIN