The M30 Bridge Erection Boat is launched into the water during new equipment operator training at Fort Leonard Wood, Mo.
Date Taken: | 05.07.2018 |
Date Posted: | 05.10.2018 10:02 |
Photo ID: | 4375121 |
VIRIN: | 180510-A-S9999-003 |
Resolution: | 6000x3368 |
Size: | 7.07 MB |
Location: | FORT LEONARD WOOD, MISSOURI, US |
Hometown: | FORT LEONARD WOOD, MISSOURI, US |
Web Views: | 526 |
Downloads: | 13 |
This work, M30 Bridge Erection Boats launches into water [Image 5 of 5], by LTC Sara Morris, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.