The former, 1960’s era 20th Medical Group facility is removed during the second phase of a military construction project at Shaw Air Force Base, S.C., May 30, 2018. The building, which was constructed as an inpatient hospital, was replaced by a $57 million medical facility in February 2017 during the project’s first phase. (U.S. Air Force photo by Airman 1st Class Kathryn R.C. Reaves)
Date Taken: | 06.15.2018 |
Date Posted: | 06.18.2018 17:47 |
Photo ID: | 4494657 |
VIRIN: | 180530-F-KQ373-1001 |
Resolution: | 2463x1255 |
Size: | 545.84 KB |
Location: | SHAW AIR FORCE BASE, SOUTH CAROLINA, US |
Web Views: | 20 |
Downloads: | 3 |
This work, 20th MDG construction begins phase II [Image 2 of 2], by Kathryn Reaves, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.