Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    205th Engineering and Installation Squadron helps complete $22 million ANG project [Image 1 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    205th Engineering and Installation Squadron helps complete $22 million ANG project

    AURORA, COLORADO, UNITED STATES

    07.19.2018

    Photo by Staff Sgt. Kasey Phipps 

    137th Special Operations Wing

    Tech. Sgt. Daniel Griswold, a 205th Engineering and Installation Squadron (205th EIS) assistant project team chief, and Senior Master Sgt. Dustin Mercer, the 205th EIS project team chief, watch the completion of the installation and protection of a splice case inside a manhole, July 19, 2018, during a hangar renovation project at Buckley Air Force Base in Aurora, Colorado. The 205th EIS team, from Will Rogers Air National Guard Base in Oklahoma City, completed more than 1,000 cable drops and installed an estimated 200,000 feet of indoor cable as part of the 6-week install for the renovation, which was estimated to be $22 million project in total. (U.S. Air National Guard photo by Staff Sgt. Kasey M. Phipps)

    IMAGE INFO

    Date Taken: 07.19.2018
    Date Posted: 08.16.2018 09:46
    Photo ID: 4651662
    VIRIN: 180719-Z-GD644-037
    Resolution: 3000x2002
    Size: 5.79 MB
    Location: AURORA, COLORADO, US

    Web Views: 29
    Downloads: 9

    PUBLIC DOMAIN