Contractors with be Himalayan Consultants complete a geotechnical drilling operation Aug. 14, 2018, at Fort McCoy, Wis. The work was done as part of an architectural redesign for an installation building. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 08.14.2018 |
Date Posted: | 08.23.2018 12:15 |
Photo ID: | 4668573 |
VIRIN: | 180814-A-OK556-1017 |
Resolution: | 5184x3456 |
Size: | 2.71 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 9 |
Downloads: | 3 |
This work, Geotechnical drilling at Fort McCoy [Image 6 of 6], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.