Sailors with Naval Mobile Construction Battalion 4 adjust the placement of a cement slab with the bucket of a backhoe during the construction of the Musa Qal’eh Wadi Crossing, Sept. 24. The cement slabs provide a foundation for concrete bunkers to be placed on top, allowing vehicles to drive on the foundation while the seasonal river flows beneath.
Date Taken: | 09.24.2011 |
Date Posted: | 10.06.2011 01:38 |
Photo ID: | 468852 |
VIRIN: | 110924-M-RI804-780 |
Resolution: | 5616x3744 |
Size: | 5.27 MB |
Location: | MUSA QAL'EH, AF |
Web Views: | 110 |
Downloads: | 3 |
This work, Musa Qal'eh Wadi Crossing under construction, Sept. 21 [Image 3 of 3], by Cpl Clayton Vonderahe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.