U.S. Army Corps of Engineers Task Force Recovery Commander MAJ Scotty Autin (L) and team observe the water being pumper around the Guajataca Dam to provide drinking water to downstream residents, Isabela, Puerto Rico, August 31, 2018
Ongoing construction of Guajataca Dam Interim Risk Reduction Measures will provide a 100 year level of protection to the dam and a 1000 year level of protection for the spillway and channel.
Date Taken: | 08.31.2018 |
Date Posted: | 08.31.2018 16:37 |
Photo ID: | 4694643 |
VIRIN: | 180831-A-IF251-383 |
Resolution: | 6000x3124 |
Size: | 13.13 MB |
Location: | ISABELA, PR |
Web Views: | 35 |
Downloads: | 5 |
This work, Guajataca Dam [Image 11 of 11], by Andrew Kornacki, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.